SnagR connects developers with contractors, field team with head office, and data with analytics. No more time lost to paperwork, compiling reports and in between communications with subcontractors. From now on, focus solely on building and creating values.
SnagR integrates seamlessly with a project's scheduling system. Import the project plan from your current scheduling software, all tasks and activities will be automatically loaded into the SnagR web and mobile app.
Capture progress on-site with photos, percentage sliders and hold-points. SnagR ensures each hold-point to be complied before you moving on to the next task.
Digital forms enable the office to have real-time information
All issues are plotted directly on your drawings digitally for everyone to easily locate and identify them.
Home owners can fill out the forms anytime, anywhere
Digitised forms and checklists ensure that zero time is lost to physically transporting papers from the site to the office or data-entry. The real-time data can be visualised and analysed immediately from anywhere in the world.
Plot photos on drawings using mobile devices to save enormous time doing routine tasks by logging observations directly on-site. Photos are automatically logged to the specific location to the nearest 1 meter. Annotate and comment on photos to make the data more insightful.
A unique QR code is given to each piece of site plant and equipment to tether all related information to one place.
Any data logged using SnagR are stored in the cloud (clients can opt for self-hosting) and can be easily retrieved.
Eliminate the post-safety walk paperwork by recording safety findings and distribute them to relevant parties on the spot with SnagR mobile app.
Raise and manage NCR easily with all data stored in one document, with drawings, photos, locations and any relevant attachments linked to the report; Check signed-off documentation once corrective action is completed.
Capture data project-by-project and record everything on digitised forms filled out by on-site safety personnel. Record full audit trail for all steps in the process of accident register.
Data in forms and drawings can be collated, analysed, reported and even integrated to your back-end system and visualised with automatically-generated KPI dashboards - review critical information any time, anywhere.
Eliminate manual efforts wasted on creating or submitting reports. Customise your report templates, and SnagR will automate the process from report generation to sending out reports.
Customise your BI dashboards to answer specific business questions. These dashboards are interactive, real-time and can be accessed anytime anywhere.
Hold-points are integrated across mobile and web platforms, together with the traffic light system on SnagR's customised dashboards, ensuring all activities and tasks achieve project requirements.
Handover is time-sensitive and issues have to be fixed before the contractual deadline. Monitor the handover progress with the real-time progress dashboard to ensure everything is done on-time.
Hold-points are integrated across mobile and web platforms, together with the traffic light system on SnagR's customised dashboards, ensuring all activities and tasks achieve project requirements.
Record full audit trail to meet compliance requirements.
+(44) 1785 660005 | [email protected]
+(852) 5712 7282 | [email protected]
+(971) 42 43 2607 | [email protected]
+(612) 8317 3608 | [email protected]
+31 (0)6 18202510 | [email protected]
+(65) 3159 1010 | [email protected]
Indata (Partner)
+(55) 11 5594-7172 | [email protected]
Solstice Digital Solutions (Partner)
+(39) 324 5653064 | [email protected]
Asia Headlands (M) Sdn Bhd (Partner)
+(60) 12 3479 323 | [email protected]
VDB Dynamic (Partner)
+(27) 82 223 8407 | [email protected]
Preston Asset Management (Partner)
+(66) (0) 65 647 4778 | [email protected]
Copyright © 2018 SnagR Ltd | All Rights Reserved | Privacy Notice | Available on iOS and Android.